Oil & Energy
PENGASSAN Decries Influx Of Indian Expatriates In Oil, Gas Sector
The Petroleum And Natural Gas Senior Staff Association Of Nigeria (PENGASSAN) has expressed worry over the increasing influx of Indian expatriates in the nation’’s oil and gas sector.
Speaking at the Closing Ceremony of the 3rd Energy and Labour Summit, themed “The Future of Nigeria’s Oil and Gas Industry: Energy Mix, Energy Security, Artificial Intelligence, Divestment, and Crude Oil Theft”, in Abuja, the association’s President, Festus Osifo, highlighted various challenges facing the sector the most as the influx of foreigners.
Osifo expressed alarm over the growing dominance of expatriates, particularly from India, in roles that he said should be reserved for Nigerians, citing that in Sterling Oil, the number of Indian workers surpasses that of Nigerians, with Indian nationals occupying roles as operators, vulcanizers, and even gatekeepers.
In his words, “they are taking over low-level jobs, which is a blatant abuse of the expatriate quota system”.
The PENGASSAN President criticized the Nigerian Content Development Monitoring Board (NCDMB) for its inability to curb this trend despite continuous engagement.
He further alleged that Indian companies are manipulating the system by registering multiple companies to exploit the expatriate quota system insisting that the union is prepared for confrontation if necessary.
“Our graduates who are fresh out of universities are desperately searching for jobs, yet we continue to grant expatriate quotas to these Indian companies, who in turn abuse the system.
“We cannot be slaves in Nigeria. Nigeria’s oil resources belong to Nigerians and it should benefit them first and foremost”, he stated.
Osifo also highlighted a similar situation at Indorama’s facilities in Port Harcourt, where the number of Indian employees exceeds that of Nigerians, with the former being paid in U.S. dollars while Nigerian workers suffer from the impact of currency devaluation saying “this situation is unacceptable and it must be addressed now””.
The PENGASSAN boss, therefore, called on the Federal Government to take immediate and decisive action against the menace to further protect Nigerian workers’ rights and opportunities.
Oil & Energy
Navy Nabs Six Oil Thieves, Dismantles Illegal Refining Site
The Nigerian Navy Units under the auspices of Operation Delta Sanity says it has recorded significant successes against crude oil theft and illegal refining sites in the Niger Delta.
The Navy, in an updated operations, said the successes were recorded between Thursday August 29 and Monday September 2, 2024.
According to the information, on 29th August, seven large cotonou and two fibre boats operated by heavily armed oil thieves loading crude oil from an illegal loading point around Botokiri axis of Nembe Local Government Area of Bayelsa State were seized.
Also, on 31st August, six suspected crude oil thieves with 109 sacks of illegally refined petroleum products, four fibre boats and two wooden boats were arrested and seized along Ogboinbiri-Kasama-Azama-Isoni of Bayelsa State.
Again, on 1st September, two wooden boats and 328 sacks of illegally refined automated Gas Oil were seized at Otuogori community’s river bank in Yenagoa, Bayelsa State.
Additionally, on 2nd September, 35 sacks of illegally refined Automotive Gas Oil in a wooden boat were seized at Gbaraun area of Southern Ijaw Local Government Area of Bayelsa State.
These successes indicate the effectiveness of Operation Delta Sanity, and the resolve of the Nigerian Navy to sustain current efforts to rid Nigeria’s maritime environment of the menace of crude oil theft and enhance crude oil production for the overall growth of the economy.
Oil & Energy
Security Agencies, MDAs Owe Eko DISco N42bn – BPE
The Eko Electricity Distribution Company Plc. has clarified that the Ministries, Departments, and Agencies of the Federal Government, including the military, owed the power distribution company N42billion as the cost of electricity consumed and not N144billion.
The Bureau of Public Enterprise(BPE), disclosed this in a Statement signed by the Head, Public Communications, Amina Othman, at the Weekend.
According to the Statement, the Disco affirmed that its total outstanding debt was N144billion, of which the MDAs and the military owe N42billion.
“The Eko Electricity Distribution Company Plc has clarified that contrary to earlier reports, the aggregate outstanding debt owed by consumers is N144billion, out of which, ministries, departments, and agencies including the military owe N42billion”, Othman stated.
The Statement said this was against prior reports that the MDAs, including the army, police, and other government agencies, were owing N144billion and had refused to pay.
The Disco said, “the clarification became necessary for proper reportage on the matter and to put the records straight”, it stated.
Recall that during a recent oversight visit by members of the House of Representatives Committee on Privatisation and Commercialisation, led by its Chairman, Ibrahim, the Acting Managing Director of the EKEDC, Mrs. Rekhiat Momoh, among other things, informed the members about the legacy debts owed the company by MDAs.
The committee had reported the acting MD as stating that the company was owed N144billion by MDAs within its operational area, saying she mentioned that the military, police, and various state government agencies failed to settle their debts, creating financial difficulties for the distribution company.
Oil & Energy
Unveiling Of Crane: Energy Infrastructure Set To Get Boost
Energy infrastructure, a crucial part of global oil and gas supply and the energy transition, are set to get a boost after a heavy lifting equipment provider unveiled the world’s strongest crane-equipment capable of lifting 6,000 tons, or 15 fully loaded Boeing 747 aircraft.
Dutch heavy lifting and transport services company Mammoet has launched a new type of crane, the SK6,000, which, the firm said, could be used for modules to be built faster and also “bigger than ever before”.
As oil and gas continue to be a key part of the world’s energy system—and likely will continue for decades to come—and as renewable energy developers aim for bigger wind turbines, the support equipment for installing oil and gas platforms, offshore wind equipment, and even nuclear power stations is becoming bigger.
Bigger cranes such Mammoet’s SK6,000 could remove some of the limitations of engineering and construction firms. These firms are generally limited by how much weight can be lifted when installed on a platform or turbine.
Cranes that can carry 5,000 tons and more can shorten the time of a project being erected on a site, onshore or offshore, Mammoet says.
“Limitations on lifting capacity force engineers to fabricate smaller modules than would be optimal; tying up site space and increasing the complexity and duration of projects,” the company notes.
“This limitation can also narrow the execution choices available during each project’s planning stage and the percentage of each project that can be executed locally.”
These days, energy companies and their contractors seek faster deployment of energy infrastructure, be it wind turbines or floating production storage and offloading (FPSO) vessels and platforms for oil and gas production.
“There are so many supply chain constraints at the moment that need to be de-bottlenecked,” Gavin Kerr, Mammoet’s director of global services, told Bloomberg, commenting on the new crane.
“The bigger everything gets, you need bigger cranes.”
Moreover, the SK6,000 is containerised and can be assembled quickly on-site. This feature allows it to deliver heavy lift capability wherever it is needed, giving contractors greater flexibility in where and how energy projects are completed” Mammoet said.
“With the innovation of the SK6,000 crane, our customers can think bigger than ever before; pushing modules beyond the 4,000t and even 5,000t barriers. Its low ground bearing capacity also means the crane can be used all over the world”, said Mammoet’s Sales Director Giovanni Alders.
“With its long outreach, small minimum footprint and relatively small site impact, the SK6,000 greatly reduces the topside integration time.
“Needless to say, with larger building blocks you spend less time connecting and testing, and more time producing” Alders added
Energy companies do need faster permit-to-production times in both oil and gas and renewable energy to provide the conventional and green energy sources the world will need.
Wind turbine technology is evolving and making the hub height increasingly taller. According to the Office of Energy Efficiency & Renewable Energy at the U.S. Department of Energy, the hub height for utility-scale land-based wind turbines has surged by 83per cent since 1998–1999, to about 103.4 meters (339 feet) in 2023. That’s taller than the statue of Liberty.
The average hub height for offshore wind turbines in the United States is projected to grow even taller from 100 meters (330 feet) in 2016 to about 150 meters (500 feet), or about the height of the Washington Monument, in 2035, DOE said.
In the oil and gas industry, new resource development is needed as demand for LNG grows and legacy oilfields mature and output declines.
If contractors can bring energy projects on stream faster, both oil and gas supply and the energy transition will benefit.
By: Charles Kennedy